SUBSTITUTION
REQUEST
(After the Bidding phase) |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Undersigned certifies:
- Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
- Same warranty will be furnished for proposed substitution as for specified product.
- Same maintenance service and source of replacement parts, as applicable, is available.
- Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
- Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.
- Proposed substitution does not affect dimensions and functional clearances.
- Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
- Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
|
|
| Submitted by: |
|
| Signed by: |
|
| Firm: |
|
| Address |
|
| Telephone: |
|
| Attachments: |
|
|
| A/E's REVIEW AND ACTION |
|
Substitution approved - Make submittals in accordance with Specification Section 01330. |
|
Substitution approved as noted - Make submittals in accordance with Specification Section 01330. |
|
Substitution rejected - Use specified materials. |
|
Substitution Request received too late - Use specified materials. |
|
|
|
Copyright 1996, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 |
September 1996
CSI Form 12.1A |
|
|
|